Via Lino Liuti, 2/A

61122 Pesaro (PU) - Italy

+39-(0123) 123456

24/7 Support

Get a Free Quote

Edit Template

News & Events

Marco Tozzi Speaking

Intelliformer at Eurodoble 2026: wind fleet growth and transformer insulation life

Intelliformer attended Eurodoble 2026, which took place in Milan from 2 to 5 November. Over four days, people working in the power field met to...

Coiltech Italia 2026

Intelliformer at Coiltech Italia 2026: a transformer’s life starts at birth

At Coiltech Italia 2026 in Pordenone (23–24 September), Marco Tozzi, Claudio Serafino and Ivan Bergonzi spoke at the CEI study day “How to extend the...
FAT 2026

Factory Acceptance Test 220/30 kV 130 MVA

A succesful FAT witnessed by Intelliformer team of a 130 MVA 220/30 kV transformer for Scottish Southern Electricity Renewables (SSER) in Nari Bori , Chongqing....
inspection active part 2026

On the Factory Floor: Witnessing the Heart of a 130 MVA Power Transformer

Between core stacking and the final weld of the tank lid, a power transformer’s fate is largely decided inside its active part — the assembly...

Untitled

400 kV 200 MVA Installation Supervision in Greece

Intelliformer has succesfully completed the Supervision of the Installation and Commissioning of a large 200 MVA CHINT unit in Greece connecting a new 150 MW...